Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

Piraeus Project progress

JANUARY 2021

JANUARY 2021

  MANIATIKA STATION STATION’s OPEN CUT The following works have been completed: Completion of the permanent lining of the shaft The following works are in progress: Waterproofing of the roof slab Masonry walls – plastering works at levels -4, -3, -2 and -1 Architectural finishes – Painting works at level…
Μάθε Περισσότερα
Koridallos

DECEMBER 2020

  MANIATIKA STATION STATION’s OPEN CUT The following works have been completed: Waterproofing of perimeter walls Permanent lining of the foundation (level -4) Permanent lining of E/M slab (level -3) Permanent lining of the concourse slab (level -2) Permanent lining of staircace S4 Permanent lining of E/M slab (level -1)…
Μάθε Περισσότερα
Aghia Varvara

NOVEMBER 2020

  TZAVELA SHAFT The following works have been completed: Permanent lining of the bottom of the shaft Permanent lining of the connecting tunnel Removal of temporary steel frames for the support of the TBM tunnel Permanent lining of the perimeter wall of the shaft Permanent lining of interior parapet wall…
Μάθε Περισσότερα
Koridallos

OCTOBER 2020

  TZAVELA SHAFT The following works have been completed: Permanent lining of the bottom of the shaft Permanent lining of the connecting tunnel Removal of temporary steel frames for the support of the TBM tunnel Permanent lining of the perimeter wall of the shaft Permanent lining of interior parapet wall…
Μάθε Περισσότερα
Nikea

SEPTEMBER 2020

  TZAVELA SHAFT The following woks have been completed: Permanent lining of the shaft’s bottom. Permanent lining of the connecting tunnel. Dismantling of the temporary steel arch for TBM tunnel support. Permanent lining of the perimeter parapet wall of the Permanent lining of the interior parapet wall and staircase. Permanent…
Μάθε Περισσότερα
Πρόοδος Πειραιά - ΑΥΓΟΥΣΤΟΣ 2020

AUGUST 2020

[responsivevoice_button voice=”UK English Female” buttontext=”Listen to post”]   MANIATIKA STATION STATION’s C/C The following works have been completed: Waterproofing of perimeter parapet walls Permanent lining of the foundation (level -4) Permanent lining of E/M slab (level -3) Permanent lining of the ticketing area slab (level -2) Permanent lining of staircace…
Μάθε Περισσότερα
Koridallos

JULY 2020

[responsivevoice_button voice=”UK English Female” buttontext=”Listen to post”] AGHIA VARVARA – KORYDALLOS – NIKEA STATIONS The works for the construction of AGHIA VARVARA, KORYDALLOS and NIKEA Stations in Metro Line 3 Extension CON-12001 “AGHIA MARINA–PIRAEUS” have been completed. Commissioning of AGHIA VARVARA, KORYDALLOS and NIKEA Stations: 06/07/2020. TZAVELA SHAFT The following…
Μάθε Περισσότερα

JUNE 2020

  AGHIA VARVARA – KORYDALLOS – NIKEA STATIONS The works for the construction of AGHIA VARVARA, KORYDALLOS and NIKEA Stations in Metro Line 3 Extension CON-12001 “AGHIA MARINA–PIRAEUS” have been completed. Trial run for the upcoming delivery of the stations: 06/07/2020. TZAVELA SHAFT The following works have been completed: Permanent…
Μάθε Περισσότερα

MAY 2020

  AGHIA VARVARA STATION The following works are in progress: Wall and columns cladding (metal, glass etc.) Reinstatement works at street level (passageways, marbles) Other reinstatement works at street level Installation of metal false ceilings Architectural finishes (installation of balustrades and handrails) Installation of lifts at street level. MEGALOU ALEXANDROU…
Μάθε Περισσότερα

APRIL 2020

AGHIA VARVARA STATION  The following works are in progress: Wall and columns cladding (metal, glass etc.) Square reinstatement (installation of marbles) Other reinstatement works at street level Station signs and other signs Installation of metal false ceilings Architectural finishes (installation of balustrades and handrails) Other architectural finishes. MEGALOU ALEXANDROU SHAFT…
Μάθε Περισσότερα
WCAG