Thessaloniki Base Project progress

Θεσσαλονίκη Ιούλιος 2022

July 2022

New Railway Station: Completed are works for the installation of Platform Screen Doors (PSD). In progress are works for the installation of cable trays at levels -1 and -2 and at the tunnel leading to DIMOKRATIAS Station. DIMOKRATIAS Station: Completed are surface reinstatement works at the junction of Dodekanissou and…
Μάθε Περισσότερα
Θεσσαλονίκη Ιούνιος 2022

June 2022

• New Railway Station: Completed are marble cladding works at the central staircase, from the ticketing level to the platform. In progress are marble cladding works at the fixed staircase of the north access, works for the installation of Platform Screen Doors (PSD) as well as works for the installation…
Μάθε Περισσότερα
Θεσσαλονίκη Μάιος 2022

May 2022

• New Railway Station: In progress are works for the installation of Platform Screen Doors (PSD) at tracks 1 & 2 and works for the installation of guides for aluminum panel lining at the ticketing level. • DIMOKRATIAS Station: Completed are the works for the installation of PSDs, while reinstatement…
Μάθε Περισσότερα
Θεσσαλονίκη Μάρτιος 2022

March 2022

• New Railway Station: Completed are works for the installation of guides of the exterior roller shutters at the accesses. In progress are works for the installation of ventilation / air conditioning system equipment. • DIMOKRATIAS Station: Completed are works for the installation of guides of the exterior roller shutters…
Μάθε Περισσότερα
Θεσσαλονίκη - Φεβρουάριος 2022

February 2022

• New Railway Station: Completed are hole drilling works for the installation of the platform screen doors (PSD) support sub-frames and of the transformers at the Lighting and Auxiliary Power Supply Substation (LAS). In progress are works for the installation of cable trays in the tunnel towards DIMOKRATIAS Station. •…
Μάθε Περισσότερα
Θεσσαλονίκη Ιανουάριος 2022

January 2022

New Railway Station: In progress are hole drilling works for the installation of the platform screen doors support sub-frames. With regard to the traction power supply equipment, the installation of the 20 KV Medium Voltage MVP and SMVP.switchboards in the Lighting and Auxiliary Power Supply Substation (LAS) have been completed,…
Μάθε Περισσότερα
Θεσσαλονίκη Οκτώβριος 2021

October 2021

New Railway Station: Completed are the works for the pumping station cladding using ceramic tiles, as well as the works for the installation of the monorail. Moreover, the installation of the traction power equipment (technical room 3.9), except for the transformer, has been completed. In progress are vertical marble cladding…
Μάθε Περισσότερα