Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

Thessaloniki Base Project progress

Θεσσαλονίκη Μάρτιος 2022

March 2022

• New Railway Station: Completed are works for the installation of guides of the exterior roller shutters at the accesses. In progress are works for the installation of ventilation / air conditioning system equipment. • DIMOKRATIAS Station: Completed are works for the installation of guides of the exterior roller shutters…
Μάθε Περισσότερα
Θεσσαλονίκη - Φεβρουάριος 2022

February 2022

• New Railway Station: Completed are hole drilling works for the installation of the platform screen doors (PSD) support sub-frames and of the transformers at the Lighting and Auxiliary Power Supply Substation (LAS). In progress are works for the installation of cable trays in the tunnel towards DIMOKRATIAS Station. •…
Μάθε Περισσότερα
Θεσσαλονίκη Ιανουάριος 2022

January 2022

New Railway Station: In progress are hole drilling works for the installation of the platform screen doors support sub-frames. With regard to the traction power supply equipment, the installation of the 20 KV Medium Voltage MVP and SMVP.switchboards in the Lighting and Auxiliary Power Supply Substation (LAS) have been completed,…
Μάθε Περισσότερα
Θεσσαλονίκη Οκτώβριος 2021

October 2021

New Railway Station: Completed are the works for the pumping station cladding using ceramic tiles, as well as the works for the installation of the monorail. Moreover, the installation of the traction power equipment (technical room 3.9), except for the transformer, has been completed. In progress are vertical marble cladding…
Μάθε Περισσότερα
Θεσσαλονίκη Νοέμβριος 2021

November 2021

New Railway Station: With regard to the traction power equipment, the installation of a rectifier transformer is at a completion stage. In progress are works for the installation of equipment bases at the Lighting and Auxiliary Power Supply Substation (LAS). Completed are works for the installation of the fire-fighting system…
Μάθε Περισσότερα
Θεσσαλονίκη Δεκέμβριος 2021

December 2021

New Railway Station: In progress are vertical marble cladding works at the accesses. With regard to the traction power supply equipment, the installation of the rectifier transformer has been completed. Completed are also works for the installation of equipment bases of the Lighting and Auxiliary Power Supply Substation (LAS), except…
Μάθε Περισσότερα
Θεσσαλονίκη Αύγουστος 2021

August 2021

New Railway Station: Works for the installation of fire-rated air ducts at the platform level have been completed. DIMOKRATIAS Station: Surface reinstatement works at the north section have been completed and the section has already been delivered for use to the public. In progress are marble cladding works at level -1 and…
Μάθε Περισσότερα
Θεσσαλονίκη Ιούλιος 2021

July 2021

NEW RAILWAY STATION: In progress are works for the installation of cable trays at the Forestation tunnel, as well as works for the configuration of the surrounding area at the northern section of the station. DIMOKRATIAS Station: Completed are works for the closing of the temporary opening of the roof slab, as…
Μάθε Περισσότερα
Θεσσαλονίκη Ιούνιος 2021

June 2021

NEW RAILWAY STATION: In progress are marble cladding works are at level -1, works for the installation of fire-rated air ducts at platform level and works for the redevelopment of the surrounding area at the north section of the station. DIMOKRATIAS Station: In progress are works for the closing of the temporary…
Μάθε Περισσότερα
WCAG