TRAM Project progress

APRIL 2019

Α. Tramway The works for the construction of the tramway corridor (trackwork – rails – catenary) have been completed. The following works are in progress: The trial run of the Tramway system and the adjustment – checking of the systems and devices controlling the operation of the Tramway system (for…
Μάθε Περισσότερα

MARCH 2019

Α. Tramway The works for the construction of the tramway corridor (trackwork – rails – catenary) have been completed. The trial run of the Tramway system has commenced. Setting – checking of the systems controlling the operation of the Tramway system extension to Piraeus from the Central Control Room in…
Μάθε Περισσότερα

FEBRUARY 2019

As regards the TRAMWAY NETWORK The works for the construction of the Tramway corridor have been completed (trackwork – rails – catenary) have been completed. The trial run of the Tramway system commenced, while checking – arrangements – tests of the Tramway and catenary related installations are at the completion…
Μάθε Περισσότερα

JANUARY 2019

As regards the TRAMWAY NETWORK The works for the construction of the Tramway corridor have been completed (trackwork – rails – catenary) have been completed. The checking – arrangements – tests of the Tramway and catenary related installations are at the completion stage, while the trial running of the Tramway…
Μάθε Περισσότερα
eikona palia 1

DECEMBER 2018

OTHER WORKS (reference to extensive fronts of works) Along the Tramway route in Piraeus Seven (7) out of the eleven (11) power supply connections of the Tramway stops with the PPC network have been completed. The works for the installation of urban fittings are at the completion stage, while the…
Μάθε Περισσότερα
palia eikona 2

NOVEMBER 2018

In the area of PIRAEUS Checks – arrangements – testing of the Tramway corridor, turnouts and catenary and the tramway signaling continue, while the trial operation of the Tramway will commence soon. OTHER WORKS (reference to extensive fronts of works) Along the Tramway route in Piraeus The works for the…
Μάθε Περισσότερα
AM_TRAM_Oct2018-

OCTOBER 2018

In the area of PIRAEUS Checks – arrangements – testing of the Tramway corridor, turnouts and catenary have commenced, while the trial operation of the Tramway will commence soon. OTHER WORKS (reference to extensive fronts of works) Along the Tramway route in Piraeus The works for the installation of E/M…
Μάθε Περισσότερα

SEPTEMBER 2018

In PIRAEUS The works for the Multi-Channelled Layout and the Overhead Traction Line are at a completion stage. Civil works have been completed, while E/M works in the new Substation no. 16 are on hold. OTHER WORKS (extensive fronts of works) Along the Tramway route in Piraeus The works for…
Μάθε Περισσότερα

AUGUST 2018

[responsivevoice_button voice=”UK English Female” buttontext=”Listen to post”] A. With regard to the TRAMWAY CORRIDOR and the Overhead Traction Line: Works at the Tramway corridor (trackwork – rails and Catenary poles) have been completed throughout the Project, in particular: At Piraeus: From the beginning, at Neo Faliro stop and through Ethnarhou…
Μάθε Περισσότερα

June 2018

A. With regard to the TRAMWAY CORRIDOR: • At Piraeus: – The following activities are in progress, which complete the Tramway Line extension to Piraeus: the construction of the Tramway corridor at Vas. Georgiou street (from the end of Tinaneios (Tinan) garden to Akti Miaouli), as well as the installation…
Μάθε Περισσότερα