TRAM Project progress

August 2014

Investigation trenches have been drilled at the locations where twin underground litter bins at Gr. Lambraki Street are to be placed; The works for the construction of Myrtidiotissas bridge have commenced, while the technical works in several locations of the TRAMWAY route are in progress (in the area where KARAISKAKI…
Μάθε Περισσότερα

July 2014

Technical works are currently in progress at various locations along the tramway route. More specifically, the construction of the foundation piles for Myrtidiotissa Bridge at SEF terminal Stop has been completed, while other works are currently in progress. Moreover excavations in the area of Lambraki reversing point have been completed,…
Μάθε Περισσότερα

June 2014

The works for the relocation of Trolleybus line No. 20 have commenced (from Vas. Georgiou street to Bouboulinas street); The works for the relocation of PUO networks (i.e. of the sewage pipe at Grigoriou Lambraki street) and of PPC networks at SEF (Piece and Friendship Stadium) stop area and at…
Μάθε Περισσότερα

May 2014

Traffic arrangements were completed at the current phase in the Central district and district A’ of Piraeus Municipality; The urban planning works at the sidewalk of Grigoriou Lambraki street are in progress; The technical works at various locations of the Tramway route (at Peace and Friendship (SEF) terminal Tramway stop,…
Μάθε Περισσότερα

April 2014

Further to the implementation of the traffic arrangements in Piraeus Central and 1st District, the works related to the reinstatement of traffic isles, road marking etc. are in progress; Urban planning works have commenced at the sidewalk of Grigoriou Lambraki Street across the tramway route; Technical works have commenced in…
Μάθε Περισσότερα

March 2014

Traffic arrangements (Phase B’) were implemented in district A’ of Piraeus Municipality (Piraiki area), while the reinstatement of traffic islands, stripings etc. is in progress; The delimitation of individual worksite areas is in progress, while the following works are about to commence, namely the configuration of Lambraki Ave. U-turn, of…
Μάθε Περισσότερα

February 2014

Traffic arrangements were implemented in the central district of Piraeus Municipality; The works for the relocation of trolley-bus lines (lines 16, 17 and 20) outside the Piraeus Tramway extension path are in progress; In building 2 of the of Elliniko Tramway Depot building installations, the works related to its architectural…
Μάθε Περισσότερα

January 2014

Works related to traffic arrangements have commenced in the central area of Piraeus region; Works for the relocation of Trolley-bus lines from the Tramway extension line to Piraeus have commenced (Relocation of Trolley-bus network (Line 20) to 2asMerarhias street); At the building facilities of the Tramway Depot at Elliniko, in…
Μάθε Περισσότερα

December 2013

The organization of individual worksites at several locations along the Tramway Extension to Piraeus (Lambraki Avenue U-turn, Karaiskaki Bridge) has commenced; Works for replacing the canopy of the workshop at Building No. 1 have been completed; architectural finishes and electromechanical works at Building No. 2 are at an advanced stage;…
Μάθε Περισσότερα

November 2013

The topographical survey works in roads and sidewalks along the Tramway Extension to Piraeus are at an advanced stage; Architectural finishes and electromechanical works at Building No. 2 are in progress, while the dismantling works in the areas of Building No. 1 to be re-configured in the Tramway Depot Building…
Μάθε Περισσότερα