Kalamaria Project progress

Πρόοδος έργου Καλαμαριάς - Οκτώβριος 2020

October 2020

  KALAMARIA Station: Landing paving works at the staircase of the eastern entrance and works for the installation of scaffoldings for the installation of glass panels at the sheds of the eastern and western entrances are in progress. In progress are also works for the installation of earthing and cabling…
Μάθε Περισσότερα
Πρόοδος επέκτασης προς Καλαμαριά - Σεπτέμβριος 2020

September 2020

  NOMARCHIA Station: The works for the installation of a steel emergency escape hatch have been completed, while in progress are works for the installation of HVAC equipment. KALAMARIA Station: In progress are works for the construction of network-related infrastructure and works for the implementation of traffic regulations -phase H.…
Μάθε Περισσότερα
Πρόοδος επέκτασης προς Καλαμαριά - Αύγουστος 2020

August 2020

  NOMARCHIA Station: In progress are electrical works and works for the installation of hatches. KALAMARIA Station: In progress are works for the construction of the infrastructure for electromechanical networks at the northeastern section of the station and works for the installation of granites and galvanized barriers at the south…
Μάθε Περισσότερα

July 2020

  Kritis Shaft: Preparatory works for street-level reinstatement are in progress. NOMARCHIA Station: In progress are works for the installation of windows in rooms 2.2 & 2.3, as well as earthing works and works for the installation of air duct networks for HVAC system. KALAMARIA Station: In progress are works…
Μάθε Περισσότερα

June 2020

Kritis Shaft: The works for the construction of masonry walls and plastering works have been completed, while the works for door installation are in progress. NOMARCHIA Station: In progress are the works for the installation of glass doors at platform level and of windows in rooms 2.2 & 2.3, as…
Μάθε Περισσότερα

April 2020

Kritis Shaft: The preliminary works for the construction of masonry walls are in progress. NOMARCHIA Station (station & crossover): The preliminary works for the reinstatement of the surrounding area and the works for the installation of a fire detection network are in progress. KALAMARIA Station: The works for the installation…
Μάθε Περισσότερα

March 2020

NOMARCHIA Station (station & crossover): The works for the installation of granites at the platform level have been completed. KALAMARIA Station: In progress are works for the reinstatement of the surrounding area, the paving of cement mortar for the sub-base of granites at the platform, as well as the works…
Μάθε Περισσότερα

February 2020

NOMARCHIA Station (station & crossover): In progress are the works for the installation of granites at the platform level, as well as the works related to sewage, earthing of electric trays and piping of the lighting network, power distribution and low voltage (weak currents) networks. KALAMARIA Station: In progress are…
Μάθε Περισσότερα

January 2020

Kritis Shaft: The works for the construction of the permanent lining are in progress. NOMARCHIA Station (station & crossover): The works for the installation of galvanized balustrades and handrails are in progress. Moreover, in progress are the works for the installation of ventilation equipment, fire-rated air ducts, fire fighting networks…
Μάθε Περισσότερα

December 2019

NOMARCHIA Station (station & crossover): Painting works have been completed at the track level of the crossover. The works for the construction of metal items in the surrounding area of the station are in progress. KALAMARIA Station: The works for the installation of outdoor staircases have been completed. Pontou shaft:…
Μάθε Περισσότερα