Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

Day: November 6, 2018

AM_TRAM_Oct2018-

OCTOBER 2018

In the area of PIRAEUS Checks – arrangements – testing of the Tramway corridor, turnouts and catenary have commenced, while the trial operation of the Tramway will commence soon. OTHER WORKS (reference to extensive fronts of works) Along the Tramway route in Piraeus The works for the installation of E/M…
Μάθε Περισσότερα

OCTOBER 2018

Kritis shaft: The works for the construction of the connecting tunnels are in progress. NOMARCHIA Station: The painting works are completed. KALAMARIA Station: The works for the permanent lining of the eastern access of the Station are in progress. ARETSOU Station: The works for the concreting and waterproofing of the…
Μάθε Περισσότερα

OCTOBER 2018

TBM Access Shaft: The works for the waterproofing of the perimeter walls have been completed. Komninou Shaft: The works for the excavation and temporary retaining of the shaft and the connecting tunnel, as well as the works related to masonry, cladding, installation of doors and industrial floors have been competed.…
Μάθε Περισσότερα

OCTOBER 2018

NEW RAILWAY Station: The works for the construction of indoor partitions are in progress. DIMOKRATIAS Station (Station and Crossover): The works for closing the southern opening, as well as for the reinstatement of the southern sidewalk of Monastiriou street are in progress. Works related to the implementation of the next…
Μάθε Περισσότερα
WCAG