OTHER WORKS (reference to extensive fronts of works)
Along the Tramway route in Piraeus
- Seven (7) out of the eleven (11) power supply connections of the Tramway stops with the PPC network have been completed.
- The works for the installation of urban fittings are at the completion stage, while the works for the installation of the E/M equipment are in progress.
At Tsamadou street
- The section from Ethnikis Antistasseos Street to Iroon Polytechniou Street was handed over to the public.
At the Peace and Friendship Stadium
- At an advanced stage are the works at Alikakou Square, at Lambraki Bridge and at the U-turn from Mikras Asias to Lambraki Street for the installation of balustrades offering safe circulation of pedestrians and vehicles.
In several areas of Piraeus
- The installation works to all 130 underground litter bins systems have been completed, while the related functional connections & tests, as well as the procedure for their delivery for use, are in progress.