Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

AUGUST 2019

KORYDALLOS STATION

The following works are in progress:

  • Door installation
  • Ceramic tiles installation
  • Granite or marble installation

MANIATIKA STATION

UNDERGROUND NATM SECTIONS OF THE STATION (ΝΑΤΜ)

The following works have been completed:

  • Permanent lining of the lower transverse tunnel and of the west elevator

DIMOTIKO THEATRO STATION

UNDERGROUND SECTION OF THE STATION

The following works have been completed:

  • Permanent lining concreting works
  • Concreting works for masonry walls and the platform slab

ENTRAMCE TO KORAI SQUARE

The following works have been completed:

  • Concreting works for the permanent lining of the floor, the perimeter walls and the ceiling (the area of the elevator is pending)

PANEPISTIMIO SHAFT

The following works have been completed:

  • Archaeological excavation and deconstruction
  • Excavation – temporary retaining of shaft and pumping station
WCAG