NEW RAILWAY STATION: The works for the configuration of the surrounding area at the north part of the station are in progress.
VENIZELOU Station: The works for the construction of the guide rails of the southern access diaphragm walls and the works for the relocation of sewage networks are in progress.
AGHIA SOFIA Station: The works for the construction of the permanent lining of the southern access are in progress.
PANEPISTIMIO Station: The works for the grinding of the rails’ welding of the floating slab of track 2 are in progress.
PAPAFI Station: The preparatory works for testing the fire fighting network in the tunnel of track 2 towards EFKLIDIS Station are in progress.
EFKLIDIS Station: The works for sealing the pumping station are in progress.
FLEMING Station: Testing of the fire fighting, discharge and water supply networks in the tunnel of track 2 towards ANALIPSI Station, as well as works for the construction of the floating slab of track 1 towards EFKLIDIS Station are in progress.
25 MARTIOU (Station and Crossover): The works for the arrangement of worksite areas as well as reinstatement works are in progress.
VOULGARI Station: The works for the installation of the fire fighting network at level -2 are in progress.
NEA ELVETIA Station: The works for the installation of PSDs on the platforms are in progress.
DEPOT:
Building Complex Ι: The building works at level +58.00, the works for the installation of the compressed air supply network, as well as the installation of the tower crane at level +69.00 are in progress.
Building Complex ΙΙ: The works for the installation of metal structures at the Operations Control Centre, as well as the works for the installation of A/C piping at level +58.00, are in progress.
TRACKWORK: Completed are the works for the construction of the floating slab of track 2 between Syntrivani crossover and PANEPISTIMIO Station, as well as the works for the installation of precast channels at track 2 between Aghia Sofia Station and Analipsi Station. In progress are the works for the construction of track 1 floating slab between EFKLIDIS and FLEMING Stations, the works for the installation of the double crossover at Analipsi Station, track bed concreting works between Voulgari and Nea Elvetia Stations, as well as assembly works for tracks 1 and 2 in the area of Aghia Sofia Station.