Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

September 2022

Καλαμαριά Σεπτέμβριος 2022
  • ARETSOU Station: In progress are works for the installation of the exterior cladding of the escalators, works for the installation of the transformers of the low voltage distribution network and traction power system, as well as works for the installation of steel ducts for the routing of Low Voltage cables within the Substation.
  • MIKRA Station (stations and crossovers): In the area of the 1st crossover, in progress are works for the construction of the lighting and irrigation networks infrastructures. In the area of the 2nd crossover, in progress are works for construction of the lighting and irrigation networks infrastructures, as well as works for the installation of steel ducts for the routing of Medium Voltage cables within the Substation.
  • TRACKWORK: Completed are works for the installation of the turnout system at the 1st and the 2nd Mikra Crossovers, while in progress are works for the installation of the fire fighting network at intersection 1 – track 2.
WCAG