Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

November 2022

Καλαμαριά Νοέμβριος 2022
  • Kritis Shaft: In progress are preparatory works for the installation of steel balustrades, skirting, as well as sealing works of the pumping station.
  • NOMARCHIA Station: In progress are works for the installation of the deluge valve drainage network.
  • KALAMARIA Station: In progress are works for the installation of air-vents of the fire-extinguishing network, as well as works for the installation of the deluge valve drainage network.
  • ARETSOU Station: In progress are works for the installation of metal glass panels at the central entrance and at the shop, as well as preparatory works for the re-installation of the municipal lighting poles. Moreover, in progress are preliminary works for the installation of the Platform Screen Doors (PSD) system, as well as works for the installation of collectors of the automatic fire-fighting network.
  • NEA KRINI Station: In progress are works for the installation of networks and equipment for HVAC system.
  • MIKRA Station (Station and Crossovers): In the station area completed are works for the installation of the Platform Screen Doors (PSD) system. In progress are works for the installation of stainless steel balustrades, connections with the collector of the automatic fire-extingushing network, works for the installation of the deluge valve drainage network, as well as works for the installation of networks and equipment for the HVAC system.
  • Terminal Shaft: In progress are works for the installation of collectors of the pumping station.

TRACKWORK:

In progress are works for the installation of the fire fighting network at interstation 1 / track 2, as well as works for the installation of electrical trays, trays earthing and air vents of the fire-fighting network at interstations 3, 4 and 5/ tracks1 and 2.

WCAG