Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

April 2023

Καλαμαριά Απρίλιος 2023
  • NOMARCHIA Station: In progress are painting works of the terminations at street level, as well as works for the installation of sound insulations.
  • KALAMARIA Station: In progress are works for the completion of the installation of escalators 3a, 3b & 4a, 4b, as well as works for the construction of the sewage system.
  • NEA KRINI Station: In progress are works for the installation of trays, earthing of trays and cabling of the lighting network at platform level.
  • MIKRA Station (Station & Crossovers): In progress are works for the construction of lining made of gypsum boards above the Platform Screen Doors (PSD), as well as works for the installation of the fire detection system. In the area of the 1st Crossover, in progress are works for the installation of sound insulation, while in the area of the 2nd Crossover, in progress are paving works.

TRACKWORK:

In progress are works for the installation of the Permanent Fire Fighting Water Supply Network in the Fire Hose Cabinets (FHC), as well as sewage related works in interstation 2.

WCAG