Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
  • The worksite installation works, as well as the assembly of the Tunnel Boring Machine (TBM) at the TBM access shaft are in full swing.
  • The 3rd phase of the traffic arrangement in the area of KORYDALLOS Station is in full operation.
WCAG