Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
  • The first Tunnel Boring Machine (TBM1), which has already bored 3,000m of tunnel, has been re-launched. The second Tunnel Boring Machine (TBM2) is anticipated to be re-launched soon (2,714m of tunnel).
  • The construction of the floor slab at the first underground level of EFKLIDIS Station is in progress.
WCAG