Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

March 2015

  • The works for the construction of a street parallel to Mitropoliti Kydonion Grigoriou Street within the area of the former Farmaki Military Camp, extending between G. Papandreou and V. Olgas Streets, as well as the works for the construction of a connecting road with Ifigenias Street have been completed. Moreover, the works for the diversion of PUO networks are at an advanced stage;
  • KALAMARIA Station: Works for the occupation of the worksite and the diversion of PUO networks are in progress, while the works concerning traffic arrangements are at an advanced stage;
  • NEA KRINI Station: The works for the construction of the Station’s perimeter retaining piles, Phase A’ of the excavation, as well as preparatory works for the installation of struts were completed, while the construction works of the Station’s retaining system (cap beams-slabs retaining system, shotcrete, nailing) are at an advanced stage;
  • MIKRA Station: The construction of temporary retaining works (prestressed anchors, bored piles, shotcrete), as well as the TBM shaft excavation are at an advanced stage;
  • KRITI Shaft: The temporary traffic arrangement works and the PUO networks diversion works have commenced;
  • The preparation of designs is in progress;
  • The expropriation of spaces at ARETSOU Station, at a part of MIKRA Station and at MIKRA Forestation is still pending.
WCAG