June 2016

  • At Mikras Asias street, in progress are the works for the construction of the tramway corridor from Papandreou Bridge up to Sarantaporou street. In progress are the works for the construction of the tramway corridor from Sarantaporou street up to Lambraki Bridge with the U-turn as well as the urban planning works at the adjacent sidewalk.
  • At Grigoriou Lambraki street, the construction of the tramway corridor at the section extending between Lambraki Bridge up to Venizelou street has been completed. Completed are the works for the archaeological excavation in the area of Evangelistrias stop. In progress are the works for the relocation of the sewage network (Gortynias – Olympias streets), the construction of the tramway corridor and the stop at Lambraki Bridge, as well as the urban planning works at the adjacent sidewalk (Venizlou – Georgiou streets) and Evangelistrias stop.
  • At Vas. Georgiou street, traffic arrangements have been implemented for the execution of works at the adjacent sidewalk. In progress are works for PUO networks (vertical PPC routings). Works for the construction of the tramway corridor at the adjacent sidewalk have commenced.
  • At Ethnikis Antistaseos street, in progress are the works for the construction of the tramway corridor from Ippodameias street up to Tsamadou street, as well as the urban planning works at the adjacent sidewalk.
  • At Omiridou Skylitsi street, traffic arrangements have been implemented for the execution of works related to PUO networks and tramway corridor construction. In progress are works for the relocation of PUO networks (EYDAP and Natural Gas), as well as urban planning works at the adjacent sidewalk (installing waste bins underneath street-level).
  • At the Peace & Friendship Stadium (SEF) stop and at Alikakou street, in progress are the works for the construction of the tramway corridor and reconstruction of the stop.
    (The reference “opposite” and “adjacent sidewalks” is related to the Tramway traffic).