Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
  • At Mikras Asias street, in progress are the works for the construction of the tramway corridor (from Papandreou bridge up to the U-turn), as well as the urban planning works at the adjacent sidewalk.
  • At Grigoriou Lambraki street, the construction of the tramway corridor at the section extending between Distomou and Pylis streets has been completed. In progress are the works for the relocation of the sewage network (Gortynias – Olympias streets), the construction of a tramway corridor from the Bridge up to Venizelou street, the archaeological excavation in the area of Evangelistrias stop, as well as the urban planning works at the adjacent sidewalk.
  • At Vas. Georgiou street, the urban planning works have been completed at the opposite sidewalk from Lambraki street up to Filonos street, while the works at the vertical PPC routings are in progress.
  • At Ethnikis Antistaseos street, in progress are the archaeological excavation works in the tramway corridor area and at Aghia Triada stop, the earthworks for the construction of the tramway corridor from Tsamadou street up to Ippodameias street, as well as the urban planning works at the adjacent sidewalk.
  • At Omiridou Skylitsi street, in progress are the works for the relocation of PUO networks (EYDAP and Natural Gas), as well as the works for the installation of systems for installing waste bins underneath the surface at the adjacent sidewalk.
  • At the Peace & Friendship Stadium (SEF) stop and at Alikakou street, in progress are the works for the construction of the tramway corridor.(The reference “opposite” and “adjacent sidewalks” is related to the Tramway traffic).
WCAG