Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

July 2015

  • In progress are the relocations of the following networks: sewage and EPA at Vassileos Georgiou street, EYDAP sewage & water supply– EPA and OTE at the sidewalk of Grigoriou Lambraki street adjacent to the Tramway corridor, and finally the sewage network at Omiridou Skylitsi street;
    Archaeological finds were revealed at the trenches excavated for the relocation of PUO networks adjacent to the sidewalks of Grigoriou Lambraki and Vassileos Georgiou streets, while the pertinent archaeological excavation is currently in progress;
  • In progress are earthworks for the tramway corridor at Papandreou bridge, at Mikras Asias and Gr. Lambraki Streets, as well as trackworks at Myrtidiotissa bridge. In progress is also the foundation construction for the Catenary poles at Mikras Asias street;
  • In progress are works for the installation of underground waste bins along Ethnikis Antistaseos, Gr. Lambraki and Mikras Asias streets.
WCAG