December 2014

  • The works for the installation of poles for changing the layout of ILPAP network were completed at Kononos street while, apart from the excavation of investigation trenches at various locations of the Project, works for the relocation of PUO networks at Lambraki street (EPA network, PPC and road lighting networks on the sidewalk parallel to the Tramway route) are in progress;
  • The construction of technical works in the vicinity of the future Karaiskaki stop, at the Peace and Friendship Stadium (SEF), at Lambraki bridge etc.) is in progress;
  • Urban planning works (re-configuration of sidewalks and planted areas, installation of underground waste bins etc.) were completed at the sidewalk of Mikras Asias street parallel to the Tramway route. Dismantling works of the central traffic island on Ethnikis Antistaseos street commenced, while works on the sidewalk of Grigoriou Lambraki street, parallel to the Tramway route, at the U-turn of Lambraki street (i.e. the Tramway corridor area), the sidewalks on Lambraki bridge etc. are in progress.
WCAG