Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
  • NEW RAILWAY Station: The works for the construction of retaining piles in the shafts and the diversion of the combined-flow network are in progress.
  • DIMOKRATIAS Station: the excavation works are completed, while in progress are the preparatory works for the subsequent traffic phase.
  • AGHIA SOFIA Station: The works for the construction of the northern access (anchors, struts) are in progress.
  • SINTRIVANI Station – REPORT: The works for the construction of the foundation micro-piles, along with the excavation and temporary retaining of the northern access are completed. In progress are the preparatory works for the subsequent traffic phase along with the archaeological excavations at the southern ventilation shaft.
  • PANEPISTIMIO Station: In progress are the works for the construction of the platform.
  • PAPAFI Station: In progress are the works for the construction of the slab at -2.
  • EFKLEIDIS Station: In progress are the works for the construction of the pits for the E/M routing.
  • FLEMING Station: In progress is the construction of foundation slab.
  • TBM tunnels: In progress is the construction of the TBM tunnel from Voulgari Station to Patrikiou Crossover.
  • ANALIPSI Station and Crossover: In progress are preparation works for the arrival of the two TBMs at the crossover.
  • Cut and Cover Tunnel: Section III: Temporary retaining works are in progress. Moreover, PUO network diversions in its section at Allatini Street are in progress.
WCAG